December 15, 2020.
The project consists of; Galloway Trail Reconstruction – Republic Road to Sequiota will remove 2700 linear feet of asphalt trail from Barton Street to Republic Road and replace it with concrete trail. The new concrete trail will be placed on the same alignment as the existing trail and widened to 8-10 feet where not limited by physical or safety constraints.
A pre-bid conference will be held at 10 a.m. on December 1, 2020 via Microsoft Teams/audio conference call.
Click invitation to bid 2722 for complete Invitation to Bid document.