December 15, 2020.
The project consists of; Sidewalk Connection to Galloway Trail – Greenwood to Lone Pine will construct a traffic signal with pedestrian crossing at Lone Pine and Greenwood. A 5′ wide sidewalk shall be build along the east side of Lone Pine to cross at Covington and become a 10′ shared use path to the exiting Galloway Trail.
A pre-bid conference will be held at 10 a.m. on December 1, 2020 via Microsoft Teams/audio conference call.
Click invitation to bid 2723 for complete Invitation to Bid document.