![](https://springfieldcontractors.org/wp-content/uploads/CityLogo_WIDE_FullColor_300dpi.jpg)
Active
Browse Awarded Bids
Bid Details
Agency Name | City of Springfield, MO – Division of Purchases |
---|---|
Bid Writer | Kilina Goldenberg |
Bid ID | IFB-IFB 004-2025-0-2024/KG |
Bid Type | IFB – Invitation for Bid |
Broadcast Date | 07/16/2024 11:00 AM Central |
Fiscal Year | 2024 |
Due Date | 08/15/2024 3:00 PM Central |
Bid Status Text | None |
Additional Registration
(NEW)
|
NONE |
Scope of Work
The project will help to reduce flooding to residential properties in this area through the excavation of roughly 5.5 ac.-ft. of material within the sinkhole flood area and increasing the storage nearly twenty percent (20%). In addition, ov ……
Show More
Documents
Filename | Type | Date Modified | Status | |
---|---|---|---|---|
BID 004-2025IFB | Bid Document / Specifications | Jul 10, 2024 | Complete | |
ATTACHMENT 1 – ARPA SPECIFICATIONS | Attachment | Jul 10, 2024 | Complete | |
ATTACHMENT 2- STORMWATER IMPROVEMENT PLANS | Attachment | Jul 10, 2024 | Complete | |
ATTACHMENT 3 – SPECIFICATIONS FOR CITY OF SPRINGFIELD AND CITY UTILITIES | Attachment | Jul 10, 2024 | Complete | |
ATTACHMENT 4 – CITY UTILITIES PLANS 90867 | Attachment | Jul 10, 2024 | Complete |
Distribution Info
Bid Bond | REQUIRED |
---|---|
Plan (blueprint) | Electronic plan documents |
eBidding | Yes |
Distributed By | DemandStar |
Distribution Method | Download |
Distribution Options | Uploading electronic plan files (.plt, .dwg, .dwf) |
Distribution Notes | None |
Publications
Springfield News Leader
View Legal Ad
Pre-Bid Conference
NON-MANDATORY A pre-bid conference is scheduled for July 23, 2024 at 10:00 A.M. (CST). The pre-bid conference shall be conducted via videoconference. To participate email the Buyer, Kilina Goldenberg (kilina.goldenberg@springfieldmo.gov) for the link and password. All interested bidders are
encouraged to participate.
Commodity Codes
[022-913-45] Construction, Sewer and Storm Drain
[022-913-81] Maintenance and Repair, Sewer and Storm Drain, Including Removal
![](https://springfieldcontractors.org/wp-content/uploads/CityLogo_VERT_FullColor_300dpi-1024x686.jpg)