Primrose Roadway Improvements
Description Project consists of improvements to Primrose Street from National Avenue to Kimbrough Avenue. Construction items estimated at, but not limited to, driveway and sidewalk removal, 1800 LF of reinforced concrete pipe (12″-42″), 24 curb/grated inlets, 4550 LF of curb and gutter, 260 SY pinned-on concrete medians, 2190 SY of concrete sidewalk, 10570 CY of excavation, 5970 of 2″ mill and overlay, 3890 SY of asphalt pavement, 12000 SY of concrete pavement, subgrade stabilization, installation of handholes, conduits, power cabling, signal pole bases, signal controller bases and poles, signal heads, pedestrian heads, power supply, vehicle detection system, gas and water improvements.
Location Springfield, Missouri
City of Springfield -Contact Brandon Braun 417-864-1969
Prebid Date 10/28/13 10:00 am
Bid Date 11/6/13 10:00 am
Notes 10/22/13 – PLEASE NOTE THE CHANGE OF LOCATION FOR THE PRE-BID MEETING which will now be held inside the northern most construction trailer that lies in the parking lot on the northwest corner of Kings Avenue and Primrose Street.