RFP 35619 NEW MECHANICAL ROOM WITH REPLACEMENT BOILER AND CHILLER AT THE PRINCE LANE FACILITY

ELECTRONIC COPIES

Contract Documents for Bidding Event 0000035619, complete with detailed specifications and bid form, can be viewed and downloaded by navigating to the following Website and searching by bidding event number or name:

https://webapp.cityutilities.net/psp/ebid/CU_SUPPLIER/ERP/h/?tab=DEFAULT

Click on “All CU Bidding Opportunities”

Then click on “0000035619”

You will have access to open, print and/or save pdf file(s).

or go to

www.cityutilities.net by following these links:    –  My Business    –  Business to Business    –  Purchasing & Vendors    –  Current Bidding Events & Awards Results    –  All CU Bidding Opportunities    –  0000035619

You will have access to open, print and/or save pdf file(s).

***** DO NOT USE THIS FORM TO SUBMIT YOUR BID *****

If you have any questions, please contact Carol Crawford at (417) 831-8333.

PRE-BID MEETING

DATE:  9-19-13 TIME:  10 am local time LOCATION: Prince Lane Conference Room 828 N Prince Lane Springfield, Missouri

BID OPENING

DATE:  9-26-13 TIME:  2:00 pm local time LOCATION: City Utilities’ Purchasing Department 301 E. Central Street Springfield, Missouri

NEW MECHANICAL ROOM WITH REPLACEMENT BOILER & CHILLER AT THE PRINCE LANE FACILITY

The project is centered within the Storeroom located between the 828 N. Prince Lane and 825 N. Belcrest offices and involves demolition of the existing boiler, chiller, pumps and related specialties, demolition of the existing mechanical room’s walls and overhead; construction of an enclosed, enlarged mechanical room with the installation of a new boiler and chiller with pumps and all hardware and specialties, complete with controls integrated with the existing building control system.  Owner shall furnish the chiller and refrigeration monitor and the Contractor shall install all equipment and furnish all other equipment, hardware and specialties complete with start-up and commissioning of all systems.  The construction to commissioning window is limited to start Friday, November 1st and finish on Friday, November 15th