Pre-bid Date: November 9, 2021, 10:00 AM,

Hammons Student Center, Room 242

Bid Date: November 23, 2021, 2:00 PM,

Video Conference Via Zoom, https://missouristate.zoom.us/j/97639012797.

Estimate: $2,345,000.00
Project Manager: Eric Easter
Project Description:

 

This project installs an additional chiller in chiller station number six (6) located adjacent to Hammons Student Center. The additional chiller will help ensure that the district chilled water system has adequate capacity to serve the Springfield Campus and will help ensure the reliability of the system. In order to locate the new chiller in chiller station number six (6), the aging boilers that currently serve Hammons Student Center will need to be removed from the building. This project will provide a new consolidated boiler plant located in JQH Arena. The new boiler plant will serve Hammons Student Center, as well as JQH Arena. The new boilers will be high-efficiency gas fired condensing boilers, increasing energy efficiency, and allowing for better control of the heating system for the adjoining buildings. Owner furnished equipment to include pumps, condensing boilers, chiller, cooling tower, and various electrical substations, switches, and panels.

 

Plans & Specifications Available: Plans and specifications may be viewed/downloaded through our e-bidding service provider, DemandStar.
DemandStar Access: Submitted bids must be received electronically through our e-bidding service provider, DemandStar.  Bidding documents and any addendums are available at https://www.demandstar.com/app/agencies/missouri/missouri-state-university/procurement-opportunities/f6e6a3d7-625e-4022-8b68-c47f650addc0/.

 

Website Access: Further information on plans, specifications, and our e-bidding service, DemandStar, can be obtained at https://plans.missouristate.edu/.

 

Parking: A pre-bid parking permit has been provided within the project manual for your use.  Depending on the pre-bid itinerary, parking may be made available at the Burgess House or near the construction site.  The Burgess House has a very small parking lot.  When attending a pre-bid or bid opening, if the lot is full, there are meters across the street on the University campus. The visitor/metered parking area is located to the south of Bear Boulevard on Florence Avenue and the adjacent Bookstore parking lot. Please be aware that vehicles parked outside of the designated areas identified within the pre-bid parking permit or within a metered parking spot will be ticketed.  A ticket could also be issued if the parking permit is not displayed as directed. The city of Springfield will issue tickets to cars parked on the neighborhood streets.